New Fiber Optic Cable Installation
End-to-end fiber network builds — from a single-home connection to a full estate rollout — planned, installed and tested to spec before handover.
Fiber Builds for Every Site
Aerial Installation
Pole-to-pole spans and aerial drop cable, suitable for suburban and rural routes where underground access is limited.
Underground Installation
Direct-buried and ducted fiber for estates, business parks and municipal areas requiring concealed infrastructure.
In-Building & FTTH/FTTB
Riser cabling, unit-by-unit drops and ONT termination for fiber-to-the-home and fiber-to-the-business connections.
From Site Survey to Handover
Site Survey & Design
We assess the route, existing infrastructure and access constraints, then propose the most practical cable path and method.
Permissions & Planning
Where wayleaves, body-corporate or municipal approvals are needed, we help coordinate the paperwork before work starts.
Installation
Cable is laid, spliced and terminated using industry-standard hardware rated for South African climate conditions.
Testing & Handover
Every link is OTDR and power-meter tested against spec, with results documented and handed over with the completed job.
Installation Clients We Work With
- Homeowners connecting to a fiber network for the first time
- Businesses and offices needing dedicated fiber links
- Property developers and body corporates rolling out estate-wide fiber
- Internet service providers extending last-mile coverage
- Contractors needing a specialist fiber subcontractor on larger builds
FAQs
How long does a new installation take?
A single connection is often done in a day; estate rollouts are scoped and phased after the site survey.
Do you do both aerial and underground fiber?
Yes, we choose the method that best fits the site and existing infrastructure.
Can you handle a full estate rollout?
Yes, from network design through to unit-by-unit handover.
Is testing included?
Every installation is OTDR and power-meter tested before we hand it over.
Built to Last, Tested to Prove It
We install using industry-standard fiber, connectors and closures rated for local climate conditions, and every link is tested and documented before we consider a job complete — no exceptions.
| Project Type | Typical Timeline |
|---|---|
| Single home / FTTH drop | Same day |
| Business / office connection | 1–3 days |
| Small estate / complex | Scoped after site survey |
| Large estate / ISP rollout | Phased project timeline |